
Geismar Laydown
Geismar, LA
Phase 1 of Geismar Storage — a ±11,600 SF industrial warehouse currently under construction off Highway 30 in Geismar, LA.

Overview
Phase 1 of Geismar Storage — a ±11,600 SF industrial warehouse currently under construction off Highway 30 in Geismar, LA.
Availability
Contact our team to walk the site, review the site plan, or discuss leasing terms and build-out. We respond within one business day.
Inquire on This SpaceSite Plan · Architectural reference
The campus plan shows the Phase 1 building and five future building positions, central circulation, Highway 30 access and drainage swales. It is a campus reference, not a confirmed building-number-to-street-address map.
MKE Architects · A1.01 · April 24, 2024Drawing basis: The 2024 sheet identifies five buildings as future and lists 11,583 SF per shell. Current delivery status and marketed areas may differ. The source cannot establish which numbered footprint belongs to each later street address; individual 3D shells are not invented from this site plan. Reference only, not a survey or confirmation of current site conditions.
Building Highlights
Location
Positioned in the heart of the Geismar petrochemical corridor — surrounding logos mark the major plants and industrial operators within minutes of the site.
Keep Exploring
Across the Corridor
Availability confirmed
Take the Next Step
Our team responds within one business day. Reach out to discuss availability, pricing, and next steps.
Ty Gose & Michael Cashio, Principals · SIOR · CCIM
Geismar, LA. We respond within one business day.