Expanding industrial complex off Highway 30

Overview
Adjacent to Talon Industrial Park, Copperhead Industrial features 19 buildings with room left to build. Office/warehouse combinations and IOS yards sit off Hwy 30 with quick routes to Hwy 73, Hwy 74, and I-10 — and the park keeps expanding as the corridor's contractor base grows.
Current Tenant

This ±8,000 SF building is leased to Bluestem Industrial. Reach out to explore comparable space across the corridor.
Building Model
Built from the construction drawings, not an artist's impression — the footprint, eave height, roof pitch, and door locations are the ones on the sheets. Drag to orbit the exterior, or switch to Roof Off to see how the office block and clear-span warehouse divide the floor plate.
Massing model for orientation only. Finishes, glazing, and site work are indicative — tap Sources in the viewer to see which dimensions came off the drawings and which were interpreted.
Site Plan
At 115 by 70 feet this is the smallest building in Copperhead, and its lot is laid out accordingly: a 30-foot loading apron across the whole south face, a single row of parking against the east wall, and a 30-foot drive out to Copperhead Road at the south-east corner. A 20-foot drainage servitude runs the west line and a 12-foot utility servitude the east.
Redrawn from R1-A1.00 for reference, not a survey. The building, loading apron, parking, drive, setbacks, servitudes and the 169-foot south line are dimensioned on the sheet; the lot's exact outline follows the road's diagonal and is scaled off the plan. Every sheet in the set is stamped “revised drawings — see original”, and the sheet itself states it is for reference only and defers final site design to the project's civil engineer.
Location
Positioned in the heart of the Geismar petrochemical corridor — surrounding logos mark the major plants and industrial operators within minutes of the site.
Keep Exploring
Take the Next Step
Our team responds within one business day. Reach out to discuss availability, pricing, and next steps.
Ty Gose & Michael Cashio, Principals · SIOR · CCIM
Geismar, LA. We respond within one business day.