
Geismar Laydown
Geismar, LA

Logistics Park
Class A distribution park at the I-10/I-49 interchange, ±50 miles from SpaceX's $100B Starbase Louisiana. Anchored by Ferguson
Demand Driver · Starbase Louisiana
SpaceX is building its largest launch site, a $100B spaceport near Pecan Island in Vermilion Parish, ±50 miles from this park. Contractors, suppliers, fabricators and logistics operators serving the buildout will need Class-A space on the interstate. Acadian Hills is at the one interchange where I-10 and I-49 meet the road south to the site.
Largest capital project in Louisiana history
Over 10 years · $92,600 average salary
Direct plus 8,100+ indirect (LED estimate)
First launch targeted as soon as 2029
I-10 runs east to Baton Rouge and New Orleans and west to Houston; I-49 runs north to Shreveport. The park sits in the northwest quadrant of the interchange where they meet.
From the interchange, the Evangeline Thruway becomes US-167 to Abbeville, then LA-82 to Pecan Island: a single route, ±50 miles as the crow flies.
Phase 1 is under development now: a ±72,000 SF spec building with 32' clear and 40 dock positions, plus a planned ±80,000 SF building. That is ahead of the 2027 construction start, not after it.
Figures as announced by SpaceX and Louisiana Economic Development on August 25, 2026: Louisiana Economic Development, CNBC, Space.com. Timelines are the sponsor's targets. Talon Industrial is not affiliated with SpaceX.
Site Plan · Preliminary
The working draft places the 40,500-, 72,000- and 80,000-SF buildings in Phase 1, with three possible 45,000-SF buildings in Phase 2. It shows proposed access, parking, a building yard and retention ponds.
CSRS, a Westwood company · Preliminary site layout · May 15, 2026 · revised file August 27, 2026Drawing basis: Conceptual working draft, subject to engineering and approvals. The file was revised in August while retaining the May title date. Parking and yard figures differ from the ARCO building-specific schematic information elsewhere on this page; the campus sketch does not supersede that design or confirm current availability. No new 3D heights or door locations are inferred from it. The preview is cropped to the plan area; the full sheet with the engineer's title block and notes is the PDF. Reference only, not a survey or confirmation of current site conditions.
Property Listings
3
Buildings
192,500 SF
Building Area
1
Available
Across the Corridor
Availability confirmed
Take the Next Step
Our team responds within one business day. Reach out to discuss availability, pricing, and next steps.
Ty Gose & Michael Cashio, Principals · SIOR · CCIM
Geismar, LA. We respond within one business day.